Solar Market · · Updated · 9 min read
India’s Solar Market in 2026: Capacity, Growth and What It Means for EPCs
India’s solar fleet passed roughly 171 GW by the end of September 2026, after a year in which the country added more solar than in any previous year. For EPCs, installers and designers, that headline hides a more useful story: where the new capacity is going, which rules changed, and why the next 12 months will reward a different kind of company than the last five years did.

This guide pulls together the numbers that matter, the policy shifts behind them and the practical choices a solar business in India faces going into 2027. Every figure is dated and sourced at the end, because in this market numbers move every month.
The numbers at a glance
Three data points explain the momentum:
- Capacity: official data published by PIB put installed solar at 164.59 GW on 31 July 2026. Industry trackers citing MNRE figures reported about 168 GW at the end of August and about 171 GW at the end of September.
- Pace: India added about 44.6 GW of solar in FY 2025–26, almost double the 23.8 GW added in FY 2024–25, according to JMK Research.
- Rooftop: Mercom reported 6.6 GW of rooftop solar added in the first half of calendar 2026, with 3.8 GW in the April–June quarter alone.

The 500 GW non-fossil capacity goal for 2030 is the backdrop to all of this. Solar is expected to supply the largest share of that target, which is why both the central government and the states keep adding schemes, tenders and rule changes aimed at speeding up installation.
Where the growth is coming from
India’s solar market is really four markets that share a supply chain:
1. Utility-scale parks and tenders
Large ground-mounted projects, mostly in Rajasthan, Gujarat and Karnataka, still make up the bulk of capacity. These are won through central and state auctions and built by large EPCs. Margins are thin, volumes are huge, and the main risks are land, transmission and curtailment rather than sales.
2. Residential rooftop
Homes are now the fastest-growing rooftop segment, driven by PM Surya Ghar: Muft Bijli Yojana. In November 2026 the Union Minister said the scheme had crossed 65 lakh rooftop installations, with the target of one crore households by March 2027. For local installers this is the largest source of leads the industry has ever had, but each project is small (usually 2–5 kW) and paperwork-heavy. Our PM Surya Ghar guide for EPCs covers the subsidy and vendor rules in detail.
3. Commercial and industrial (C&I)
Factories, warehouses, hospitals, schools and offices install solar to cut their power bill, either on their own roofs or through open access. The 100 kW threshold under the Green Energy Open Access Rules widened this market to mid-sized businesses. C&I buyers care about payback, drawings and reliability — and they now have to think about time-of-day tariffs too.
4. Agriculture
PM-KUSUM, the farm solar scheme, funds solar pumps, solarised feeders and small plants on agricultural land. Phase 1 is winding down and a second phase is expected, which makes this a market to watch for 2027.
Rooftop: a story of a few strong states
Rooftop solar is spread very unevenly. Reported 2026 figures put Gujarat at roughly 6.9 GW of rooftop capacity and Maharashtra at about 5.4 GW, with Rajasthan and Kerala each around 2 GW. Uttar Pradesh has grown quickly under PM Surya Ghar, and Maharashtra recorded the most rooftop additions in FY 2025–26.

Why the gap? The leading states combine high grid tariffs for larger consumers, DISCOMs that process net-metering applications quickly, active state nodal agencies and a dense network of trained installers. If you work in a slower state, the bottleneck is usually not demand — it is approvals, inspections and meter installation. Building a good relationship with your DISCOM sub-division office is still one of the highest-return things a small EPC can do.
Five policy shifts that changed the market in the last 12 months
GST on solar fell to 5%
From 22 September 2025, GST on renewable energy devices, including solar modules, dropped from 12% to 5%. Government estimates put the saving on a typical 3 kW home system at about ₹9,000–10,500. We explain how this flows into a quotation in our GST guide for rooftop pricing.
ALMM List-II brought cells under the approved list
Since 1 June 2026, projects covered by the Approved List of Models and Manufacturers must use cells from ALMM List-II as well as modules from List-I. Net-metering and open-access projects were given until 31 December 2026 to commission without List-II cells. This is the single biggest supply-chain change of the year; see ALMM List-II explained.
Time-of-day tariffs reached more consumers
Under the 2023 amendment to the consumer rules, solar-hour tariffs must be at least 20% lower than the normal tariff, and peak tariffs for C&I consumers at least 1.2 times normal. ToD applies where smart meters are installed, starting with larger commercial and industrial consumers. This changes how rooftop savings are calculated and makes storage more interesting.
Storage got serious funding
In June 2025 the Ministry of Power approved ₹5,400 crore of viability gap funding for 30 GWh of grid-scale battery storage, on top of an earlier tranche. Utility storage is not a rooftop installer’s business, but cheaper batteries and ToD pricing are slowly making behind-the-meter storage worth discussing with C&I clients.
Manufacturing scaled up fast
Mercom reported 261.7 GW of annual module manufacturing capacity and 36.6 GW of cell capacity in India by June 2026. TOPCon now accounts for about 80% of ALMM-listed module capacity. The gap between module and cell capacity explains much of what installers are seeing in prices.
The cell bottleneck and what it does to prices
India can assemble far more modules than it can make cells for. That matters because two of the biggest demand drivers — subsidised residential rooftop and many government projects — require domestic cells. Modules built with Indian cells (DCR modules) have therefore carried a large premium over modules using imported cells. Bulk benchmarks reported in 2026 put non-DCR TOPCon at around ₹14 per watt-peak and DCR TOPCon at around ₹22. Industry analysts expect that gap to narrow as new cell lines come online, but until it does, an installer’s margin depends heavily on how well they buy.
For a practical breakdown, read DCR vs non-DCR panels and TOPCon vs Mono PERC vs HJT.
Pressure points for EPCs
The market is growing, but it is not getting easier. The most common pain points we hear from installers are:
- Price competition: subsidy-driven residential work attracts many new vendors, and quotes are compared line by line. Small differences in module or structure cost decide who wins.
- Supply uncertainty: DCR and List-II compliant stock can be tight, and price lists change month to month. Quotes valid for 30 days can turn loss-making.
- DISCOM timelines: net-meter installation and inspection delays hold up commissioning, which delays subsidy release and the customer’s final payment.
- Working capital: EPCs often pay suppliers upfront and collect from customers after commissioning. Fast growth can create a cash crunch.
- Quality and trust: a few poor installations in a locality damage everyone’s reputation. Customers increasingly ask for shadow analysis, structure drawings and generation estimates before they sign.
- Skilled people: experienced site engineers, designers and electricians are in short supply in fast-growing districts.
Opportunities to plan for in 2027
Several openings stand out for the next year:
- The last stretch of PM Surya Ghar’s first target. With roughly a third of the one-crore goal still to go before March 2027, residential volumes should stay high. The winners will be installers who can quote, design and file quickly.
- C&I under time-of-day pricing. Businesses with smart meters will ask how ToD changes their payback. EPCs who can model hourly load against hourly generation will stand out.
- Storage add-ons. Hybrid systems for clinics, shops and homes in areas with frequent outages, and peak-shaving batteries for C&I where peak tariffs bite.
- Agriculture. If PM-KUSUM’s second phase launches with an agrivoltaics component, ground-mount design and pump-sizing skills will be in demand. See our PM-KUSUM guide.
- Operations and maintenance. Millions of new small systems need cleaning, inspection and inverter servicing. Annual maintenance contracts give steady revenue between installation peaks.
What to do now: a short checklist for solar businesses
- Lock in at least two reliable module suppliers for both DCR and non-DCR stock, and check every model against the current ALMM lists before quoting.
- Add a price-validity clause and a material-escalation clause to quotations.
- Re-check GST treatment on your invoices with your chartered accountant after the 5% change.
- Track every net-metering file by DISCOM office so you can see where delays happen.
- Give customers a clear design before they sign: roof layout, shadow analysis and an honest generation estimate. Our post on answering shading questions shows why this matters.
- Learn how ToD tariffs work in your state, because C&I customers will start asking.
Design support for growing EPCs
Quote faster without hiring another designer.
Instant Solar Design delivers 3D rooftop models, shadow analysis and generation reports from ₹500 per project, usually within 24 hours.
See design prices →Frequently asked questions
How much solar capacity does India have in 2026?
Official data published by PIB showed 164.59 GW of installed solar on 31 July 2026, and industry trackers citing MNRE data reported about 171 GW by the end of September 2026.
How much solar did India add in FY 2025–26?
About 44.6 GW, according to JMK Research — almost double the roughly 23.8 GW added in FY 2024–25.
Which states lead rooftop solar in India?
Gujarat and Maharashtra lead by a wide margin, with Rajasthan and Kerala next. Uttar Pradesh has grown quickly under PM Surya Ghar.
Why are DCR solar panels more expensive?
India has far more module assembly capacity than cell manufacturing capacity, and many subsidised and government projects must use Indian-made cells. Limited supply of domestic cells keeps DCR modules at a premium.
What is the biggest opportunity for solar EPCs in 2027?
Residential rooftop under PM Surya Ghar remains the largest volume opportunity, while C&I customers moving to time-of-day tariffs and storage add-ons offer better margins for EPCs who can model savings accurately.
Sources
- PIB — India’s energy journey (installed capacity, July 2026)
- SolarQuarter — India’s solar capacity surpasses 164 GW
- JMK Research — India installs record 44 GW solar in FY2026
- Mercom — India rooftop solar market report Q2 2026
- pv-tech — India adds 50.6 GW module and 9.7 GW cell capacity in H1 2026
- IBEF — 65 lakh rooftop installations under PM Surya Ghar
- pv magazine — module and cell prices fall after GST cut to 5%
- Energy-Storage.news — India adds 30 GWh to battery VGF scheme